Brownouts, actual and potential, have returned to some
areas of Metro Manila and surrounding provinces in the Luzon grid over the past
two weeks. This is unfortunate because electricity demand has somehow declined
because of the colder, rainy season and more power plants have been added to
the grid.
This rare event was caused by heavy stress in the Luzon
grid as a result of the unscheduled outage of several coal-fired,
hydroelectric, oil, and geothermal power plants in the grid, many of them are
already ageing. Among these coal plants were (a) 382 M-W Pagbilao’s unit 2
(U2), (b) 122 M-W South Luzon Thermal’s U1, (c) 140 M-W Southwest Luzon’s U2,
and (d) 60 M-W Limay Cogen Block 5.
Among the hydro plants were (a) 50 M-W Angat Main U4 and
(b) 180 M-W Kalayaan U1. Then 83 M-W from Makban Geothermal and 280 M-W from
Malaya Thermal U1. Almost 1,300 MW of power went on unscheduled or unplanned
outage, plus power plants on scheduled or planned maintenance shutdown.
The newly-commissioned wind and solar plants in Luzon
cannot and will not be able to fill up the power deficit. If the wind DoEs not
blow, wind power is zero; if it is night time or day time but very cloudy, then
solar power output is zero or very low.
This situation again highlights the need to continue
building new coal and natural gas plants. The proposal and lobbying by certain
sectors and environmentalist groups to discontinue building new coal plants and
build only intermittent renewable energy (RE) plants like solar and wind is not
wise. The Philippines’ fossil fuel consumption remains among the lowest in
Asia’s emerging and developed economies plus Australia.
Last Aug. 11, 2016, the Australian Energy Market Operator
(AEMO) released its 2016 Electricity Statement of Opportunities (ESoO) report
and it highlighted the growing importance of network and non-network
developments to secure future electricity generation. Notable in its report is
this warning,
“AEMO has modelled the impact of withdrawing a further
1,360 MW of coal-fired generation capacity to meet the COP 21 commitment under
AEMO’s neutral scenario, with results suggesting potential reliability breaches
occurring in South Australia from 2019-2020, and New South Wales and Victoria
from 2025 onwards.”
“Reliability breaches” is a technical term for power
outages or blackouts. And AEMO projects that it will take place in three to
four years from now. Replacing coal power with additional RE capacity will not
compensate for the loss of coal capacity.
AEMO was candid enough to categorically warn about the
dangers of cutting coal power and pushing more renewables into the system. This
candor is good because it will prepare both power suppliers and consumers of
what’s going to happen few years on the road.
One explanation for such candor by AEMO is its
independence from the government as the latter pushes for more REs.
In contrast, the Philippine Electricity Market
Corporation (PEMC), AEMO’s counterpart here as electricity market operator, is
government-dependent. It is headed and chaired by the DoE (Department of
Energy) secretary and many board members are from the government, like the
National Power Corp. (NPC), National Transmission Corp. (TransCo), and the
Power Sector Assets and Liabilities Management Corp. (PSALM).
Since the DoE is the main implementer of RE Act of 2008
(RA 9513), DoE is naturally pushing for more intermittent REs into the system
and that is what PEMC is exactly doing. The latter for instance produced a
study in November 2015 saying that REs that are priority dispatch at the
Wholesale Electricity Spot Market (WESM) have created the “merit order effect”
(MOE) in reducing the market clearing price (MCP) at WESM.
MOE can also be realized via more and cheaper
conventional plants like coal rather than expensive and intermittent REs. With
conventional plants, there is no need for additional ancillary costs.
So, since PEMC continues to be a government controlled
corporation, can we expect PEMC to be more independent, more candid, in
assessing the harm, actual and potential, of more REs in WESM and grid
stability?
The most logical answer is no. The DoE cannot contradict
itself, say that REs are necessary and say at the same time that REs are
dangerous to the customers’ pockets and the stability of the national grid.
So the important implication here is that the independent
market operator (IMO) as clearly stated in the EPIRA (Electric Power Industry
Reform Act) some 15 years ago and now represented by PEMC, should be
independent from government like AEMO. The DoE secretary and all other
government energy agencies, including those in the “advisory” capacities,
should get out of IMO or PEMC board.
Having less government intervention in the energy sector
in general and the electricity market operation in particular is pro-consumer.
Just give the consumers more choices, no or little coercion and they will
choose the least costly, the more stable and reliable energy source.
Bienvenido S. Oplas, Jr. is the head of Minimal
Government Thinkers and a Fellow of SEANET and Stratbase-ADRi.
minimalgovernment@gmail.com
Mr. Oplas has written about the PEMC, renewable energy,
and related issues in his previous columns. To read his pieces entitled “State
dependence of Philippine electricity market” and “Renewable energy, expensive
electricity, and the merit order effect,” please visit these links http://goo.gl/r0XaLt, http://goo.gl/Hf6DRg,
respectively.
See also:
BWorld 58, INDCs and PH energy realities, May 14, 2016
BWorld 66, Renewable portfolio standard and electricity prices, June 26, 2016 BWorld 70, Wind power firms corner billions of FIT money, July 09, 2016
BWorld 76, Solar can never power the PH and Asia, August 06. 2016
BWorld 78, If the US becomes protectionist, who loses? August 11, 2016